Archive

UDK: 627.231.004.67
DOI: n/a

Published: Građevinar 54 (2002) 12
Paper type: Professional paper
Download article (Croatian): PDF
Download article (English): n/a

Trogir waterfront reconstruction

Jure Radnić, Ivo Barbalić

Abstract

The solution for the Trogir waterfront starting at the bridge and spreading towards Čiovo until the Kamerlengo tower, is described in the paper. The new waterfront wall, built out of prefabricated lightened concrete elements, has shallow foundations made of rip rap 50 to 150 cm in thickness. Considering the significance of the investment and technical complexity of the project four alternative solutions were prepared, two of which for rehabilitation of the existing waterfront and two for construction of the completely new waterfront. The solution involving construction of the new waterfront was finally adopted.

Keywords
project, realization, waterfront wall, foundations, Trogir frontline, precompression , rehabilitation

HOW TO CITE THIS ARTICLE:

Radnić, J., Barbalić, I.: Trogir waterfront reconstruction , GRAĐEVINAR, 54 (2002) 12

OR:

Radnić, J., Barbalić, I. (2002). Trogir waterfront reconstruction , GRAĐEVINAR, 54 (12)
Authors:
Jure Radnic WEB
Jure Radnić
University of Split
Faculty of Civil Engineering, Architecture and Geodesy

Ivo Barbalić
Institut IGH d.d.